Ningbo fudu automation equipment co. LTD
Contact: Mr. Fu
Phone:13566606880
Tel:0574-23709308
Fax:0574-23709318
Website:www.nbfud.com
Website: en.nbfud.com
E-mail:fdsc@fudunb.com
Add: lane 266, erheng road, ningfeng north road industrial zone, changhe town, cixi city, zhejiang province
Matters needing attention for the wholesale of igniter metal pipe
The debugging of mould entry: zhejiang textile machinery accessories
1. Generally, the plate used in mold test shall not be substituted for the requirements specified in the design of the plate with brand and mechanical properties;
2. The width of strip used in the mold test should meet the requirements specified in the process regulations.For example, the width of strip used in the test of continuous die should be 0.1-0.15mm smaller than the spacing between the two guide plates.
3. During mold test, the punch die shall be used on the required specified equipment.In the installation of die, must be installed firmly, never loose;Precision metal stamping parts
4. Before the debugging of the die, it is necessary to conduct a comprehensive inspection of the die, lubricate the moving parts, and check whether the unloading and top parts are flexible;
5. It is better to check the first part of the mold test carefully.If the mould action is abnormal or the first part is unqualified, the machine should stop immediately for adjustment.
6. Generally, no less than 20 parts of the product after the mold test should be properly stored for the basis of delivery of the mold